Provides savings to the owner by eliminating asbestos liability, and landfill disposal.
Addresses all hazardous and mixed waste asbestos inventories, regardless of the matrix of the ACM. Giving the owner 30% – 50% savings on disposal costs.
Reduces abatement labor by ~25% when using ABCOV-T during the removal of certain types of ACM (boiler block, pipe lagging and spray-on fireproofing).
Returns abated area to the owner 20% sooner when using ABCOV® -T to remove boiler block, pipe lagging and spray-on fireproofing.
Customers with consistent ACM waste compositions can be provided with ABCOV® formulations that minimize destruction cost and maximize ACM throughput.
Training and Training Costs:
To use the ABCOV® Method safely and effectively all personnel, abatement, and conversion operators, who use the ABCOV® chemicals and equipment must fully understand the process operations, the parameters, and all the safety procedures:
1. All personnel must be accredited asbestos handlers and supervisors.
2. Certification training in the ABCOV® Method is required.
3. ABCOV® trains the microscopist in the ABCOV® process but does not train the microscopist to read the Polarized Light Microscope, Polarized Light Microscope reading requires special training.
Training Costs: $ 7,000.00 per person (3 days in-class, three weeks ABCOV® in-plant training (Please Note: ABCOV® does not train the microscopist to read the PLM microscope. Microscope reading requires special training)